Project Details
Contractor |
George Downing Construction Limited |
Description |
Tiling to the leisure facilities within a 31 storey mixed use development comprising of student accommodation, offices, reception and amenity spaces. Within the leisure facility Tiletec were required to apply a cementitious mortar waterproofing system along with the wall and floor tiling of a swimming pool, wet changing area, dry changing area, facility reception, toilets, offices and associated stores. |
Time on Site |
Circa 9 weeks |
Value of Project |
£386,191 |
Category / Work |
Leisure |
Sq m of tiles |
1700 sq metres |