Project Details
Contractor |
Vinci Construction UK Limited |
Description |
Tiletec carried out soft floor covering works involving 1400m2 plus of preparation and coverings, carried out airside in a secure environment. The project was split into 6 phases to enable the airport operations to continue whilst the reconfiguration of the Pier was taking place. Each phase comprised refurbishing the existing, or creating new, gateroom portals, air craft stands nodes, vertical circulation cores (VCCs) and air bridge links. Various floor covering materials were specified including entrance mattings, rubber and vinyl sheet flooring in both safety and anti static finishes. The work also included in excess of 1200m2 of pumped fast drying screeds. |
Time on Site |
18 months |
Value of Project |
£391,486 |
Category / Work |
Floor Preparation, Screeding and Soft Flooring |
Sq m of tiles |
– |