Project Details
Contractor |
Carillion |
Description |
Fit Out of the Luxury Retail area within the departures lounge at the new Terminal 2 at Heathrow Airport. Tiletec’s works included floor preparation and the laying of 255 sq m of feature, large format (1200 x 1200mm) ceramic tiles, including curved cutting. |
Time on Site |
3 Weeks |
Value of Project |
£97,300 |
Category / Work |
Floor Preparation and Tiling |
Sq m of tiles |
255sq m |