Project Details
Contractor |
Morgan Sindall Construction Limited |
Description |
Tiletec have commenced work on the Britannia Leisure Centre project, Hackney, London for their client Morgan Sindall Construction & Infrastructure Limited. Main contractor Morgan Sindall have been contracted by The Mayor and Burgesses of The London Borough of Hackney to demolish the existing leisure centre and design and build a new centre in conjunction with providing a new temporary energy centre and district heating network. Tiletec are undertaking circa 9000 m2 plus of floor and wall tiling to 3 pools, inclusive of a leisure waters pool incorporating mosaic tiles. In addition there are to be fully tiled wet and dry changing facilities along with significant areas of tiling to reception, circulation and communal areas. |
Time on Site |
21 weeks |
Value of Project |
£800,000 |
Sector |
Leisure |
Type & Area of Work |
Tiling – Circa 9000 sq m |