Project Details
Contractor |
Cranmore Prep School |
Description |
Break out of existing pool surround. Floor preparation works creating falls within existing concrete slab, re-screed pool surround to falls. Re-tile surround incorporating linear drainage channel tile, finger grip and skirting tiles. Re-tile pool floor with anti-slip tiles and replace mosaic school logo within the deep end of the pool. |
Time on Site |
5 Weeks |
Value of Project |
£61,329.00 |
Category / Work |
Education and Leisure |
Sq m of tiles |
– |